Tag: Lory Student Center

Construction
Lory Student Center north wing revitalized
The upgrades are designed to align with the style of the revitalization of the south end of the LSC completed in 2014, creating a cohesive look for the approximately 388,000-square-foot building.

Philanthropy
How to engineer a beer
Father and son alums created a mutually beneficial connection that provides for experimentation and collaboration with CSU students and their team of engineers.